Aluminum Formwork Manufacturer WALL-TIES
& FORMS
Contact Processes

Receive an assessment to make the best choice




    Our System

    The WTF formwork system (manufactured by Wall-Ties & Forms, Inc.) is unique and stands out because all of the components in the structure, such as walls, foundations, columns, beams, stairs, window moldings, balconies, and decorative details are molded and built monolithically, complying accurately with the architectural design.

    Assembly

    For the assembly of the WTF System, no skilled labor or heavy machinery or cranes is required.

    Versatility

    The WTF aluminum formwork system for on-site concrete construction is the most versatile system in the world.

    ABOUT US

    Wall-Ties & Forms, Inc, (WTF) 

    Is one of the most important producers of aluminum formwork for concrete in the world, and at the same time, the main company designer manufacturer of aluminum formwork systems. Over 45 years ago, WTF began producing thousands of separators (ties). Today it produces and ships over 30 million of them and over 100,000 aluminum formwork panels per year.

    OUR BENEFITS 

    Durability:

    Extremely resistant to wear and tear, ideal for long-term construction projects.

    Structural strength:

    Capable of withstanding heavy loads and high pressures without bending or breaking, ensuring the quality of the concrete.

    Reusability:

    Can be reused in multiple projects, making them a long-term investment.

    Reduced labor costs:

    Require less time and labor to assemble and disassemble, reducing labor costs.

    Faster construction speed:

    Can be assembled and disassembled quickly, speeding up the construction process and improving efficiency.

    Construction

    Processes

    Initial Phase

    Excavations for different types of electrical, plumbing, drainage, natural gas, and WTF foundation slab installation are performed.

    Mid-Phase

    Both the wall and slab forms are manually assembled, preferably starting with the corners.

    Finish Stage

    After pouring the concrete, the forms are removed, and the process is repeated for the next structure.

    VIDEO GALLERY

    In our extensive video gallery, you can see 14-Level Building Construction, Urban Developments, Column and Beam Construction with WTF, and many more processes where our raw material is the protagonist.

    CLICK PLAY AND DON’T MISS A SECOND.

    We are at your service

    CONTACTS

    Address:

    4000 Bonner Industrial Drive Shawnee, Kansas USA 66226

    Receive an assessment to make the best choice




      Menu